Production Management - TSA owns the technical delivery of your show, from the first production meeting to bump-out
We carry the technical side of your show.
From the first production meeting to bump-out, an experienced technical director plans the scope, sequences the build, coordinates the crew, and keeps the technical environment moving - to your schedule and your budget.
Take it all,
or take a part.
You can hand us the whole technical side of your show, or just the piece you are missing. However you start, you deal with one technical lead and the in-house disciplines behind them.
Take the whole technical solution
Design, drafting, the kit and the people to run it. One technical lead owns scope, crew, procurement, budget and bump-in to bump-out.
Take a part
Just production management on the floor, or just the design and drafting, or just the kit. Plug us in where you are short.
Work to your design
Bring your concept and cue sheet and we engineer, draft and run it. Or we design the technical solution from the brief up.
Someone owns the
technical delivery.
Production management is TSA owning the technical delivery of your production so you can run the rest of it. We translate the creative and design intent into a plan that can actually be built, rigged and run, then we coordinate the people and kit to make it happen - on the dates you run and inside the budget you set.
Our technical directors are not subcontracting the disciplines they direct. Rigging, automation, scenic fabrication and soft goods all sit with one team, so when a cue changes or a load path needs rework, the answer comes from the same team - not a chain of vendors pointing at each other. It is one part of Production Engineering.
Four jobs, one lead.
What a technical director carries.
Technical direction is owning the technical delivery of your show so you can run the rest of it. Here is what that covers, from the first production meeting to the strike.
-
Step 01
Scope & sequence
What gets built, in what order, against the production calendar.
-
Step 02
Crew coordination
Riggers, automation operators and technicians, briefed and on the floor when they are needed.
-
Step 03
Resourcing & procurement
The kit and consumables sourced and on site, not chased mid bump-in.
-
Step 04
Budget management
Tracked across the technical scope, with no surprises on opening week.
-
Step 05
Bump-in & bump-out
The load-in window planned and run, and the strike handled cleanly at the end.
It is one part of Production Engineering - technical design and drafting, automation, performer flying and custom fabrication all sit alongside it.
The technical side,
delivered.
Designed, built and run in Australia - the same team that plans the technical side of your show puts it on the floor.
See all projects
36 hoists, one ceiling, one desk.
A 36-axis hoist array and five-chord box truss - the turnkey overhead rigging behind the Great Hall.
Read the project
4,000 shows. Zero missed cues.
Seven-plus years running five performer flying rigs and the full stage automation system.
Read the project
A stage the school can run.
The technical side scoped, built and handed over so staff and casual crew can run it safely, term after term.
Explore schoolsQuestions
about production management.
If your question isn't here, talk to our team and we'll come back with the right answer for your show.
Call 1300 439 872 →Tell us about
your show.
Send the cue sheet, the dates and the venue. We'll carry the technical side of your show - designed, drafted, built and run, by one team with every discipline in-house.







